poster image
Scope of the conference
Deadlines

The registration was closed

How to Register

Fill in the online Registration Form*

*Need login with google account.

Note on the registration
Guideline for Creating Abstracts

Authors must use the Abstract Template (Microsoft Word) and follow the format carefully. Be sure to submit your abstract file after converting it to (or saving it in) PDF format. The length of the abstract should be within one page.

Time schedule
time schedule.jpg
Plenary Lectures

1) Prof. Dr. Wisanu Pecharapa
KMITL
Bio-based Nanostructure Materials and Their Environmental Applications

2) Dr. Daisuke Kageyama
NARO Tsukuba
Intracellular microbes: biological implications and potential for effective pest management

3) Prof. Dr. Qian Yang (on-line)
Harbin Institute of Technology
Advanced Study on the Informatics Metabolism and the Informatics World

4) Prof. Dr. Chieko Koike
Ritsumeikan Univ
Retinal Function in Health and Disease: Preservation and Breakdown of Signaling

5) Prof. Dr. Shushi Nagamori
Jikei Univ Sch Med
Nutrient Dynamics in Health and Disease: Membrane Transporters from Bench to Bedside

6) Asst. Prof. Dr. Yuqing Wang
Kyushu Univ
Diet and Immune Function: Current Evidence and Mechanisms

Awards

Best Senior Oral Award
  Dr. Bunyarit Meksiriporn (oral A9, KMITL, Kingdom of Thailand)

Best Senior Poster Award
  Dr. Rona Mae Pador Viernes (poster A3, Central Mindanao Univ, Republic of the Philippines)

Best Student Oral Award
  Mr. Jungu Kim (oral A6, Iwate Univ/UGAS, Japan/Republic of Korea)

Best Student Poster Award
  Mr. Kazuki Oikawa (poster A18, Iwate Univ, Japan)

Excellence Student Oral Award
  Miss Natnarin Ratthanachot (oral A4, KMITL, Kingdom of Thailand)
  Ms. Kasumi Suzuki (oral A13, Iwate Univ, Japan)

Excellence Student Poster Award
  Mr. Nara Juassawabanjong (poster B2, KMITL, Kingdom of Thailand)
  Ms. Nana Saito (poster A7, Iwate Univ, Japan)

ISBB2026/ICABM Executive Committee

host: Iwate Univ.
Assoc. Prof. Dr. Isato Araki (Fac. Ag., Iwate Univ., Chairperson)
Assoc. Prof. Dr. Pattama Wiriyasermkul (Fac. Ag., Iwate Univ.)
Prof. Dr. Chunhong Yuan (Fac. Ag., Iwate Univ.)
Prof. Dr. Masahiro Daibo (Fac. Sci. Eng, Iwate Univ.)
Assoc. Prof. Dr. Shota Uesugi (Fac. Ag., Iwate Univ.)

co-host: KMITL
Asst. Prof. Dr. Vorapat Sanguanchaipaiwong (Asst. Dean of Sch. Sci, KMITL)
Assoc. Prof. Dr. Dusanee Thanaboripat (Editor-in-Chief of CAST, KMITL)

Preview for ISBB 2027

The event is tentatively scheduled for November 2027, with Professor Yu, Guo- Hui from the Zhongkai University of Agricultural Engineering designated as the lead coordinator for the program.

TOP